The Location and Construction of the South Canal of the Uncompahgre Valley Reclamation Project

The Location and Construction of the South Canal of the Uncompahgre Valley Reclamation Project

By (author) 

List price: US$14.87

Currently unavailable

Add to wishlist

AbeBooks may have this title (opens in new window).

Try AbeBooks

Description

This historic book may have numerous typos and missing text. Purchasers can usually download a free scanned copy of the original book (without typos) from the publisher. Not indexed. Not illustrated. 1906 edition. Excerpt: ...of parts of south canal, Uncompahgre Valley Project," and addressed to The Engineer, U. S. Reclamation Service, Montrose, Colo. The address slip below may be cut out and used by the bidder if desired. The Engineer, United States Reclamation Service, Montrose, Colorado. Proposal for the construction of parts of south canal, Uncompahgre Valley Project. PROPOSAL For the construction of parts of the south canal, Uncompahgre Valley Project, Colorado., 1905. To the Secretary Op The Interior, Washington, D. C. Sir: The undersigned propose to do all the work and furnish all the material, in accordance with the advertisement and attached specifications, and bind.., on the acceptance of this proposal, to enter into and execute a contract, with necessary bond, of which this proposal, the said advertisement, and specifications shall be made a part, for performing and completing said work and supplying said material at the prices named in the schedules hereto annexed. furthermore agree, that in case of default in executing such contract with necessary bond, the check accompanying this bid, and the money payable thereon, shall be and remain the property of the United States. In case of delay in letting the contracts it is understood that all checks will be returned at the expiration of forty-five days from the date of opening bids. agree to complete the work within one year from the date of the signing of the contract by the Secretary of the Interior, beginning work within thirty days from said date, and within ninety days from the date of signing having upon the work, in the judgment of the engineer, sufficient force and equipment to complete the same within the year. Signature: Corporate Address: SEAL. Names of individual members of firm: Name...show more

Product details

  • Paperback
  • 189 x 246 x 1mm | 64g
  • Rarebooksclub.com
  • United States
  • English
  • black & white illustrations
  • 1236977718
  • 9781236977717