
23%
off
off
Accelerated Bridge Construction : Best Practices and Techniques
Free delivery worldwide
Available.
Dispatched from the UK in 10 business days
When will my order arrive?
Description
The traveling public has no patience for prolonged, high cost construction projects. This puts highway construction contractors under intense pressure to minimize traffic disruptions and construction cost. Actively promoted by the Federal Highway Administration, there are hundreds of accelerated bridge construction (ABC) construction programs in the United States, Europe and Japan. Accelerated Bridge Construction: Best Practices and Techniques provides a wide range of construction techniques, processes and technologies designed to maximize bridge construction or reconstruction operations while minimizing project delays and community disruption.
show more
show more
Product details
- Paperback | 656 pages
- 190.5 x 233.68 x 27.94mm | 1,247.37g
- 26 Aug 2014
- Elsevier - Health Sciences Division
- Butterworth-Heinemann Inc
- Woburn, United States
- English
- 0124072240
- 9780124072244
Table of contents
SECTION 1 INNOVATIVE CONSTRUCTION METHODS Chapter 1 Introduction to Modern Accelerated Bridge Construction (ABC) Chapter 2 Recent Developments in ABC Concepts Chapter 3 Research and Training in ABC Structural Systems Chapter 4 Innovative ABC Techniques
SECTION 2 RAPID CONSTRUCTION ISSUES Chapter 5 Modular Bridge Construction Issues Chapter 6 Rapid Bridge Insertions Following Failures Chapter 7 ABC Planning and Resolving ABC Issues
SECTION 3 MODULAR BRIDGES Chapter 8 Prefabrication of the Superstructure Chapter 9 Prefabrication of the Substructure And Construction Issues Chapter 10 Alternative ABC Methods and Funding Evaluation Chapter 11 A Review of Chapters, River Bridges and Conclusions
show more
SECTION 2 RAPID CONSTRUCTION ISSUES Chapter 5 Modular Bridge Construction Issues Chapter 6 Rapid Bridge Insertions Following Failures Chapter 7 ABC Planning and Resolving ABC Issues
SECTION 3 MODULAR BRIDGES Chapter 8 Prefabrication of the Superstructure Chapter 9 Prefabrication of the Substructure And Construction Issues Chapter 10 Alternative ABC Methods and Funding Evaluation Chapter 11 A Review of Chapters, River Bridges and Conclusions
show more
About Mohiuddin Ali Khan
Dr. Khan has more than 35 years of experience as a structural and bridge engineer, project and design manager for transportation and industrial clients. Ali has supervised numerous design projects on behalf of the New Jersey Department of Transportation, New Jersey Turnpike Authority, Pennsylvania Department of Transportation, Maryland State Highway Administration and Washington Metropolitan Area Transportation Authority
show more
show more