Abstracts of Proposals for Material and Labor for the Engineer Department; Letter from Secretary of War, Transmitting Abstracts of Proposals Received During the Fiscal Year Ending June 30, 1917, for Material and Labor in Connection with

Abstracts of Proposals for Material and Labor for the Engineer Department; Letter from Secretary of War, Transmitting Abstracts of Proposals Received During the Fiscal Year Ending June 30, 1917, for Material and Labor in Connection with

List price: US$15.77

Currently unavailable

Add to wishlist

AbeBooks may have this title (opens in new window).

Try AbeBooks

Description

This historic book may have numerous typos and missing text. Purchasers can usually download a free scanned copy of the original book (without typos) from the publisher. Not indexed. Not illustrated. 1918 edition. Excerpt: ...58.0519 99. 74 Item 2. Bolts and rods for Dam N o. 24... 172.50 2, 562. 2. 0539 138. 10 0519 132. 98 Item 3. Bolts and rods for weir wickets, Dan N o. 22............................. 664. 50 10, 763. 6 0539 580. 16. 0519 558. 63 Total............................... 966. 00.................... 821. 84.......... 791. 35 Abstract of proposals for constructing two 2-story, 14-room double houses at each of Dams Nos. 23, 25, and 27, Ohio River, and one.?-story, 14-room double house at Dam N0. 22, Ohio River, opened at Wheeling, W. Va., on Apr. 8, 1917, by Maj. T. E. Jackson, Corps of Engineers. 1. Earl N. Everson, 2. R. A. Mlller, Brilliant, Ohio. Middleport, Ohio. Construction of houses.-Rate. Amount. Rate. Amount. mu NO. 22.1 1 double lock-keeper-s house, with asbestos-cement shingle root. $9, 875 $9, 875 $11, 350 $11,350 1 double lock-keeper-s house, with tile roof.................".. $9, 945 $9,945 $11,625 $11,625 Will complete, calendar days.................................. 180.......... 175.......... mu NO. 23. 2 double I02' -kce pers' houses, with ashestos-cement shingle roots. $10, 175 2 double lo: x-kceoers' houses, same as above, with tile roots.. _. $10, 275 Will complete, calendar days...................................-185 DAM NO. 25. 2 double lock-keepers-houses, with asbestoscement shingle roots _ $9, 750 $19, 500 $11, 350 $22, 700 2 double lo: c-keepers' houses, same as above, with tile roofs.... $9,850 $19, 700 $11,600 $23,200 Will complete, calendar days................................... 170.......... 175.......... DAM NO. 27.2 _ 2 double lock-keepe1s' houses, with asbestoscementshingle roofs. $10, 850 $21, 700................. 9 double lock-keepers' houses. same as above, with tile...show more

Product details

  • Paperback | 52 pages
  • 189 x 246 x 3mm | 109g
  • Rarebooksclub.com
  • United States
  • English
  • black & white illustrations
  • 1236881877
  • 9781236881878